Hello eveybody
Can you help me about a project that implements a quematic system of a bank ?

We have to pay attention these :
Consider that there are two bankers helping customers. There are two types of custormers: own customer and other customers. Own customers have priority over the other customers, in which 3 customers from own customers and 1 customer from other customers are served. Assume that customer arrival times are uniformly distributed between 60-180 seconds for own customers and between 120-300 seconds for other customers. Also assume that banker 1 and 2 finish helping customers between 60-120 and 30 and 90 seconds, respectively (helping time is also uniformly distributed).
The program should count the number of customers helped (own and other customers and total customers), number of customers banker 1 and 2 helped, average time for waiting for customers, average time finishing time for each banker. Run the program for 20 minutes and display the results.

Thanx in advance




Author:
Newbie
User avatar Posts: 2
Have thanks: 0 time

This is a PROJECT ,not a small problem :D

_________________
M. S. Rakha, Ph.D.
Queen's University
Canada


Author:
Mastermind
User avatar Posts: 2715
Have thanks: 74 time

this is a homework we aint going to just do it for you give an effort on it and we ll help you out with the parts you cant figure out ...no one will just write down to you a whole project...


Author:
Moderator
User avatar Posts: 47
Have thanks: 1 time

biskot188 wrote:
this is a homework we aint going to just do it for you give an effort on it and we ll help you out with the parts you cant figure out ...no one will just write down to you a whole project...

Yes , am with you .

_________________
M. S. Rakha, Ph.D.
Queen's University
Canada


Author:
Mastermind
User avatar Posts: 2715
Have thanks: 74 time

Hi,

prof trying to reasearch a new way of earning money, by "letting"others to do his job, wow..

micky
Simulation pret


Author:
Newbie
User avatar Posts: 1
Have thanks: 0 time

On the basis of standard use Aquamatic has a program that every 48 hours activates a counter wash cycle. It is also possible to program the counter-wash cycle according to specific needs. It can be set to 12, 24, 36, 48, 60, 72 or 84 hours. It is possible to choose 1 or 2 wash cycles.


Author:
Newbie
User avatar Posts: 29
Have thanks: 0 time
Post new topic Reply to topic  [ 6 posts ] 

  Related Posts  to : a quematic system of a bank
 increase the number of bank lines by <br/>     -  
 Own an antivirus system in C#     -  
 System.currentTimeMillis as Id     -  
 The operating system using PHP     -  
 Write to system log     -  
 Queuing System Simulator (C++)     -  
 Abbreviations System java     -  
 php user registration system     -  
 Full Encription System (DES-AES,RSA and more)     -  
 How to get system time in java     -  









Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
All copyrights reserved to codemiles.com 2007-2011
mileX v1.0 designed by codemiles team
Codemiles.com is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to Amazon.com